Customization: | Available |
---|---|
After-sales Service: | on Line Technical Support, Free Spare Parts |
Feature: | Durable, Easy to Assemble, Movable, Customized |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specifications:
Material | Specification |
Length | With customer's requirement |
Width | Single span, double-span, Multi-span |
Height | With customer's requirement |
Column | Q235, Q345 welded H section steel |
Beam | Q235, Q345 welded H section steel |
Purlin | Q235, Q345, galvanized C/Z purlin |
Knee brace | Q235 angle steel |
Vertical and transversal support | Q235 angle steel, round bar or steel pipe |
Tie bar | Q235 steel pipe |
Brace | Q235 round bar |
Cladding system |
EPS, PU, Fiber Glass and Rock Wool sandwich panels or corrugated steel sheet with fiber glass wool insulation. available in Diferentcolors&gauges |
Partition wall |
sandwich panels (EPS, PU, Fiber glass,Rock Wool etc.) available in Different colors&gauges |
Door | sandwich panel sliding door or roller door |
Gutter | stainless steel or color steel sheet |
Rainspout | PUC |
Live load on roof | based on local requirement |
Wind resistance | based on local wind speed |
Earthquake-resistance | based on local requirement |
Structure usage | Up to 50 years |
Finishing options | vast array of colors and textures available |
Paint Options |
Alkyd paiting, two primary painting, two finish painting(gray paint, red paint, white paint, epoxy zinc etc.). Or Galvanized. |
Why do you choose steel structure buildings instead of concrete buildings?
1) The total weight of the building is light: about half of the concrete structure weight, which can reduce the foundation cost.
2) Fast construction: the construction period is shortened by 1/4 to 1/6 compared with the traditional concrete structure.
3) Strong flexibility: large open span design, indoor space can be divided into multiple programs to meet the different requirements of owners. In particular, the exhibition center can adopt the pipe truss structure, which is easy to realize the large space function, increase the space height, and has the characteristics of beauty and comfort. This structure has been widely used in airport projects.
4) Good energy-saving effect: the wall is made of factory-made steel components, or light-weight energy-saving standardized C-shaped steel, square steel, sandwich panel, high processing precision, good thermal insulation performance, good earthquake resistance.
5) Good environmental protection effect: greatly reduce the quantity of sand, stone, ash, environmental protection and energy saving during construction.
All of our products have already been authorized through ISO9001 quality system. We have professional quality control departments. We also have a very strict quality control system for the products. Because we want to be responsible for every product quality we sold. Our group company has set up a very good reputation for many years. We will offer the products resting assured to customer.
We put much fund in introducing advanced production lines of sandwich panels, corrugated steel sheets, H section steel, C/Z section steel, EPS foam board and EPS packing machines. Our company has well-trained processing teams, advanced technical equipment, professional quality inspection teams and mature management policies in each link, which can effectively ensure the quality of products, but also an important factor to reduce the cost of our products.
ORDER PROESS
Our factory is a professional steel structure manufacturer in China. We are capable in taking over all types of steel structure building, such as steel structure warehouse, steel structure workshop, poultry house and so on, which contains all step of designing, producing, installing.
Our factory was founded in 1997, our products have been exported to more than 80 countries all over the world. Besides, we have strong engineering teams of 60 senior engineers.
We are a group factory of 5 branch factories and we can produce all accessory materials of steel buildings by ourselves.
PRODUCTION PROCESS
OUR EQUIPMENTS
Q: You are manufacture factory or trading company?
A: We are manufacture factory. And you are welcomed to visit us at any time.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shipment.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to
quantity.
Q: Do you offer designing service for us?
A: Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (X steel) and etc. We can design complex industrial building like office mansion, supermarket, auto dealer shop, shipping mall,
hotel.
Q: Can you provide the installation help?
A: We will provide detailed instruction photos and videos to you. If it is necessary, we will send professional engineers to do the construction guidance, and some skilled workers to help installation.