Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building

Product Details
Customization: Available
After-sales Service: Long Life Service
Connection Form: Bolt Connection
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company, Group Corporation

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 RMB
Plant Area
100000 square meters
  • Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building
  • Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building
  • Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building
  • Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building
  • Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building
  • Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building
Find Similar Products
  • Overview
  • Product Description
  • Installation Instructions
  • Packaging & Shipping
  • Company Profile
  • Certifications
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
steel building
Feature
Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable, Customized
Install
Support Installation
Quality Control
Raw-Material Traceability Identification
Services
Project Design Capability
on-Time Delivery Rate
100.0%
Delivery Time
31-45 Days
Processing Service
Bending, Welding, Decoiling, Cutting, Punching
Drawing Design
Sap2000/Autocad /Pkpm /3D3s/Tekla
Material
Q235, Q355
Size
Costomers′ Requirements
Structure Type
Portal Steel Structure
Forming
Hot-Rolled Steel
Member
Steel Column
Type of Steel for Building Structure
High-Strength Steel
Residential Wall Structure
Bottom Wall Beam
Warranty
Long Life Service
Carbon Structural Steel
Q355
Transport Package
Steel Pallet
Specification
steel
Trademark
XGZ, Special Purpose Steel
Origin
Shandong, China
HS Code
9406000090
Production Capacity
2000tons Per Month

Packaging & Delivery

Package Size
1200.00cm * 215.00cm * 245.00cm
Package Gross Weight
25000.000kg

Product Description

Product Description

Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building

What is prefabricated steel structure building?

Steel structure building is built over three members connected to each other by bolts and screws:
Primary members (columns, beams) Steel columns will be H section steel, square tube steel according to different type of buildings.
Steel beams are usually H section steel. Secondary members (C or Z purlins, bracing...)
Roof and wall sheeting or sandwich panel (EPS, fiberglass wool, PU sandwich panel)
Other building components (Rolling doors, aluminium windows, etc.)
The entire primary members and secondary members are designed and fully fabricated including cut-to-length, punching, drilling, welding and performing in the factory before shipping to the site for erection.
At the site, all components are assembled and jointed via nut & bolt connections; thereby reducing the costs and assembly times.
These buildings can be provided with different structural and non-structural additions such as ventilators, doors & windows, trusses, mezzanine floors, canopies, crane, insulation…, based on the customer's requirements.
 
Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building
Steel structure workshop
Item
Specification
Steel column
Q235,355B welded H section steel/hot-rolled H steel
Steel beam
Q235,355B welded H section steel/hot-rolled H section steel
Steel purlin
C/Z section purlin
Tie bar 
Q235B steel round tube
Roof and column bracing
Q235B steel round bar, angle steel
Downpipe
UPVC
Gutter
Stainless steel gutter/0.5mm steel sheet gutter
Roof material
Corrugated steel sheet/sandwich panel
Wall material
Corrugated steel sheet/sandwich panel
Door
Rolling door 
Window 
Aluminium window 

Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building
Why choose steel structure buildings?

1. Cost Savings Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.
2. Quality Control Designed and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory.
3. Quick Erection All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install.
4. Flexibility Steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.
5. Energy Efficiency Nowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recycle.
 

Installation Instructions

Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building

Installation of prefabricated metal workshop:
1.Foundation construction (pre-embedded anchor bolts), detail need to according to the foundation construction drawing;
2.Column installation One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location;
3.Beam installation After completing the installation of adjacent two steel column, then main beam begin to install.
4.Installing roof & wall purlin The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure.
5.Fixing wall and roof sheet To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet;
6.Fixing the cover To install the cover on the corner, eave, window and door opening cover;
7.Install PVC/Aluminium windows and sandwich panel sliding doors.
Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building

Packaging & Shipping

Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building

Company Profile

 

Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building

Certifications

 

Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building

Customer Photos

Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building
Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building

Metal Frame Structure Prefabricated Warehouse Steel Structure Workshop Building

FAQ

Q: Are you trading company or manufacturer ?
A: We have our own steel structure, steel sheet and sandwich panel manufacturing factories. Welcome to our company to see our products and discuss your project.

Q: Can you provide on-site installation service?
A: We can provide Installation guide service based on customers' request. The shop drawing, installation drawing and video will send to client to help the site erection. If need, our engineer will come to site to guide the installation.


Q. What is the delivery time?
A: It depends on the quantities of order. Generally, the delivery time will be within 25 to 60 days.
 
Q. How can I get a quotation for my project?
A: Pls no hesitate to send me message here or Email me. I will reply to you ASAP. Welcome to contact me for your building!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier