Customization: | Available |
---|---|
After-sales Service: | 50 Years |
Connection Form: | Bolt Connection |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Standard | SGS, ISO, GB, CE |
Material | Q345B(S235JR&S355JR) |
Dimensions | According to the client's requirements |
FOB Price | US $ 30 - 100 / Square Meter |
Port of loading | Qingdao |
Minimum Order(ton) | 20 tons |
Payment Terms | L/C, T/T |
Quality Control | The third party, SGS, Asia INSPECTION all accept |
Surface Treatment | Shot blasting with anti rust paint or hot DIP galvanize |
Delivery Term | Within 30 days after receiving deposit |
Packaging | According yours requirement, usually bundle with steel strip |
Our Experience | Have exported more than 25 years. |
Roof, Wall material | Color steel sheet or PU, EPS, Rock Wool sandwich panel |
Window | PVC or Aluminum Alloy |
Main steel Column and Beam | H section, I section or Galvanized |
Roof Purlin | C-Section and Z-section |
Surface | 2 primer and 1 finished paint |
Local Climate | 1. Wind speed 2. Rain load 3. Snow load 4. Earthquake grade if have etc. |
Crane parameter | If need crane beam, parameter is in need. |
Package | Standard packing or as request |
Load in | 20GP, 40GP, 40HQ, 40OT |
Opinions | 1)We can supply all kinds of steel structures, steel building, metal building, modular house, steel frame for warehouse, workshop, garage etc, steel beams, other riveting and welding parts |
2)We can also make and develop new parts according to customers' drawings and detailed dimensions | |
Specifications | 1)Size: MOQ is 200m2, width X length X eave height, roof slope |
2)Type: Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floors | |
3) Base: Cement and steel foundation bolts | |
4) Column and beam: Material Q345(S355JR)or Q235(S235JR) steel, all bolts connection! Straight cross-section or Variable cross-section | |
5) Bracing: X-type or V-type or other type bracing made from angle, round pipe, etc | |
6) C or z purlin: Size from C120~C320, Z100~Z200 | |
7) Roof and wall panel: Single colorfull corrugated steel sheet0.326~0.8mm thick,(1150mm wide), or sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~100mm, | |
8)Accessories: Semi-transparent skylight belts, Ventilators, down pipe, Glavanized gutter, etc | |
9)Surface: Two lays of Anti-rust Painting | |
10) Packing: Main steel frame without packing load in 40'OT, roof and wall panel load in 40'HQ | |
Design Parameters | If you need we to design for you, pls supply us with the following parameter together with the detail size |
1)Live load on roof(KN/M2) | |
2)Wind speed(KM/H) | |
3)Snow load (KG/M2) | |
4)Earthquake load if have 5) Demands for doors and windows |
|
6)Crane (if have), Crane span, crane lift height, max lift capacity, max wheel pressure, and min wheel pressure |
We will be highly appreciated if you provide us with the information in your inquiry as followed:
1.Dimension: length*width*height
2.Brick wall needed or not, if yes, the height
3.Door quantity & size & location
4.Window quantity &size & location
5.Crane is needed or not. If yes, max lifting height, max lifting weight, and span
6.The maintenance materials you want.
7.Wind load, snow load, earthquake resistance level, fire proof level
8.Other your require informaton.
FAQ:
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
Project scope
1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.
2.We can also develop and produce new parts according to your requirements.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 50 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.