Company Nature: | Public Company |
---|---|
Delivery Time: | Normally 30-45 Days After Shop Drawing Approved |
Forming: | Hot-Rolled Steel |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Main Steel Frame | H section or C section steel | Q345 steel 8mm/10mm |
2 | Welding | Automatic Submerged Arc Welding |
3 | Rust removing | Sand blasting |
4 | Surface processing | Alkyd Paint or galvanized |
5 | Intensive bolt | Grade 10.9 |
Supporting System | Angle Brace | L50x4,Steel Q235, Process and Painting |
2 | Cross Support | φ20, Steel Q235, Process and Painting |
3 | Belt Bar | φ89*3, Steel Q235 Process and Painting |
4 | Small Brace | φ12,Steel Q235 Process and Painting |
5 | Ordinary Bolt | Galvanized Bolt |
Roof | Purlin | C160*60*2.5,Steel Q235, painting and Galvanized |
2 | Out-roof Panel | Sandwich Panel or corrugated steel plate |
3 | Transparent lighting panel | 6mm thick PVC |
4 | Accessories | Glass glue, self-tapping screw etc. |
5 | Edge Cover | Made of color steel sheet thickness 0.5mm |
6 | Gutter | Made of steel sheet thickness 0.8mm |
7 | Rainspout | 110PVC |
Wall | Purlin | C160*60*2.5,Steel Q235, Paint |
2 | Wall | sandwich panel or corrugated steel plate |
3 | Accessories | Glass Cement, Self-tapping Screw etc. |
4 | Edge Cover | Made of color steel sheet thickness 0.5mm |
5 | Axial fan | Axial Fan |
6 | Door | Rolling door/sliding door |
7 | Window | PVC / alu / steel frame window |
8 | Crane | With or without crane in 5 tons to 20 tons |
Steel Structure Workshop |
Showroom/Exhibition Hall | Poutlry/Chicken House/Farm | K House/Prefab/Container House |
Suppliers with verified business licenses